This fitting requires one 5 16 x 1 1 4 standard fence bolt and nut.
Commercial chain link fence installation instructions.
There may be local zoning or deed restrictions pertaining to height and type of fence.
Step 3 a hook up is each connection of chain link to an end or corner post.
Install an end band at the base of the terminal post.
Starting at a terminal post unroll chain link fabric on the ground along the outside of the fence line to the next terminal post.
Measure the length measure the boundary of the space you want to enclose to determine how much fencing fabric and top.
Check all the regulations about fence setbacks type and height.
Check out your property line setback requirements.
Find your boundary lines your fence posts should be at least 4 inside of the lines or the footings may go over into the.
With the end of the spool firmly in your grasp slowly pull the wire along the inside of the fence line to the other.
Locate the spool at the far end of the stretch.
Find and download specifications and drawings for all of ameristar s products.
Obtain necessary zoning and building permits.
The ears of the band pointed to the.
Mark the fence location.
Slide a tension bar through the first row of chain link diamonds.
Use a rubber mallet to drive end post caps onto the gate corner and end.
11 steps of chain link fence installation step 1.
For example a 4 high chain link fence requires three tension bands per hook up.
All posts should be set about 4 inches inside the line.
Mark the places for terminal posts place a stake at.
Put hinges and latch hardware onto the gate posts at roughly their final positions to install later.
End posts have one hook up.
Chain link fence installation manual before you begin.
Lay it on the ground and cut the banding.
Next measure the total length of the fence and mark where each terminal post will go.
Locate your property s line.
To install a chain link fence start by establishing your property lines and placing your post holes 4 inches inside those lines.
You ll want to dig your terminal posts first and then install your line posts.
Slide tension bands onto each corner gate and end post.
Step 4 place one brace band on first to use if bottom tension wire will be installed.